URA sale site · Confirmed List
Dairy Farm Walk (29,444.2 sqm parcel)
Allowable development: Residential.
© OpenStreetMap contributors © CARTO
- Launched for tender, Confirmed List
- 26 November 2025
- Tender closed
- 22 January 2026
Tender outcome
The tender has closed. No award had been published on the reading date, so no winner is shown.
S$427,000,268
Closed 22 January 2026 with 5 bids. Not an award.
29,444.2
As stated on 26 November 2025 [ura-pr25-61/pr25-61a2.pdf]. Subject to cadastral survey
41,222
As stated on 26 November 2025 [ura-pr25-61/pr25-61a2.pdf]
480
URA's estimate, not a cap. As stated on 26 November 2025 [ura-pr25-61/pr25-61a2.pdf]
What matters about this site
URA sale site of 29,444.2 sqm on a 99-year lease in Bukit Panjang. Allowable development, as the record states it: Residential.
Released on the Confirmed List.
The tender closed on 22 January 2026 with 5 bids. No award had been published by 22 January 2026. URA estimated about 480 homes.
Investigate this site
Overview
The site particulars in force on the reading date, each with the document that stated it. A cap is labelled as a cap and an estimate as an estimate; a figure the annex did not give is absent.
- Selling authority
- URA
- Allowable development
- Residential
- Tenure
- 99 years
- Programme list
- Confirmed List, launched for tender[ura-pr25-61/pr25-61a2.pdf]
- Site area
- 29,444.2 sqmSubject to cadastral survey, as the annex states.[ura-pr25-61/pr25-61a2.pdf]
- Maximum GFA
- 41,222 sqm[ura-pr25-61/pr25-61a2.pdf]
- Estimated housing units
- 480[ura-pr25-61/pr25-61a2.pdf]
- Height control
- 4 and 6 storeys[ura-pr25-61/pr25-61a2.pdf]
- Tender conditions
- Housing yield: The number of units is an estimate; the annex says the actual number may vary. Not a cap.
- Facts as stated on
- 26 November 2025
Tender
Milestones on record
Programme: Confirmed List, launched for tender, as stated on 26 November 2025. Being on a list is not a tender launch: a launch is the release that reports one.
- 26 November 2025Launched for tender, Confirmed List release
- 22 January 2026Tender closed release
How the bids compared
5 tender groups submitted 5 bids at the close on 22 January 2026.
Valid bids ranged from S$372,500,000 to S$427,000,268.
5
S$54,500,268
Highest minus lowest valid bid, as a share of the lowest.
- ABR Holdings Limited, LWH Holdings Pte. Ltd., Macly Capital Pte Ltd and RP Ventures Pte LtdS$427,000,268S$962 psf ppr
- GuocoLand (Singapore) Pte. Ltd. and Intrepid Investments Pte. Ltd.S$425,425,000S$959 psf ppr
- SNC3 Realty Pte. Ltd., Apex Asia Beta Investment Three Pte. Ltd., Soon Li Heng Strategic Holdings Pte. Ltd. and Kay Lim Realty Pte. Ltd.S$410,875,000S$926 psf ppr
- Kingsford Huray Development Pte LtdS$377,250,000S$850 psf ppr
- Sim Lian Land Pte Ltd and Sim Lian Development Pte LtdS$372,500,000S$840 psf ppr
The tender has closed and the bids are below. No award had been published as of 22 January 2026.
Bids at the close of 22 January 2026
5 priced bids as listed in ura-pr26-04. S$ psm of GFA is the published rate; psf ppr is derived from it. These bids are provisional: nothing had decided the tender as of the reading date, so no outcome is shown and the highest is not an award.
| Rank | Tenderer | Tendered price | S$ psm GFA | S$ psf ppr (derived) |
|---|---|---|---|---|
| 1 | S$427,000,268 | S$10,358.55 | S$962 | |
| 2 | S$425,425,000 | S$10,320.34 | S$959 | |
| 3 | S$410,875,000 | S$9,967.37 | S$926 | |
| 4 | S$377,250,000 | S$9,151.67 | S$850 | |
| 5 | S$372,500,000 | S$9,036.44 | S$840 |
Comparable land sales
Reading comparable land sales…
Location
- Parcel
- Boundary published in URA's sale-site layer, drawn at the top of the page.
- Planning area
- Bukit Panjang, as URA's sale-site layer gives it.
- On the map
- View on Map for the parcel in its surroundings: Master Plan land use, transport, nearby sale sites and developments.
Developments nearby
Finding developments nearby…
The market when bids closed
When bids closed on 22 January 2026, URA's latest quarterly figures were for 3Q2025, published 24 October 2025, 90 days earlier.
URA's 4Q2025 release is not in the archive yet, and it may have been published before 22 January 2026. Until it is added, 3Q2025 is the latest release shown.
No release since the close is in the archive yet. Figures will appear here as releases are added.
Swipe the table sideways for every quarter
| Private residential | 1Q2025Apr 2025 | 2Q2025Jul 2025 | On the day3Q2025Oct 2025 | Trend |
|---|---|---|---|---|
| Prices | ||||
| Private home price index | 211.1 | 213.2 | 215.1 | |
| Non-landed, core central region | 156.0 | 160.7 | 163.4 | |
| Private rental index | 158.5 | 159.8 | 161.7 | |
| Sales | ||||
| New homes sold by developers | 3,375 | 1,212 | 3,288 | |
| Resales | 3,565 | 3,647 | 3,881 | |
| Sub-sales | 321 | 269 | 235 | |
| Units launched | 3,139 | 1,520 | 4,191 | |
| Supply | ||||
| Unsold, uncompleted, with planning approval | 18,125 | 18,498 | 17,029 | |
| Pipeline with planning approval | 35,364 | 36,663 | 36,814 | |
| Vacancy rate | 6.5% | held | held | |
Each figure is the quarter's own value as URA printed it in that quarter's release, not as later revised. Select a figure to see the annex and page it comes from.
Held back: URA prints the number in more than one place and the table's labels do not settle which one it is, so the archive stores it but does not show it.
Analyse in Studio
Start a preliminary feasibility study from this site in Prevo Studio. It is a working model for your own assumptions, not a valuation, an approval or a completed feasibility.
Carried from this record
- Site boundary
- From the agency's sale-site layer
- Site area
- 29,444.2 sqm
- Maximum GFA
- 41,222 sqm
- Tenure
- 99-year lease
- Land price
- Not carried: no award, so you enter your own
- Comparable land sales
- Read again by the same rules on the study's own date, so a study begun today may hold later awards than this page
You confirm in Studio
- The cadastral lots under the sale boundary, before planning controls are read from them.
- Zoning, plot ratio and height controls, read from the Master Plan layers; each one Studio cannot settle is marked for you to enter.
- The selling price: Studio offers an estimate from nearby new sales, labelled as an estimate, for you to replace.
- Construction costs, unit mix and the other scheme assumptions.
- Your land price: the record holds no award for this site.
Sources
Every release that touched the site, latest first, each on its own date with its text folded beneath, then the documents behind the page.
22 January 2026
Tender closedTender closing for URA sale site at Dairy Farm Walk
5 bids disclosed
Highest S$427,000,268 (S$10,358.55 psm GFA) from ABR Holdings Limited, LWH Holdings Pte. Ltd., Macly Capital Pte Ltd and RP Ventures Pte Ltd. Provisional: nothing had decided the tender, so the highest bid is not an award.
Read the press releaseHide the press releaseura-pr26-04
1 The Urban Redevelopment Authority (URA) closed the tender for the site at Dairy Farm Walk today.
2 The site at Dairy Farm Walk was launched for public tender on 26 November 2025.
3 Please see Annex A for details of the site and tender bids received.
4 This is not an announcement of tender award. A decision on the award of the tender will be made after the bids have been evaluated. This will be publicised at a later date.
26 November 2025
Launched for tender, Confirmed ListURA launches tender for three sale sites at Dairy Farm Walk, Tanjong Rhu Road, and Dover Drive
Read the press releaseHide the press releaseura-pr25-61
1. The Urban Redevelopment Authority (URA) has released three residential1 sites at Dairy Farm Walk, Tanjong Rhu Road, and Dover Drive2 for sale today under the second half 2025 (2H2025) Government Land Sales (GLS) Programme.
2. The sites at Dairy Farm Walk, Tanjong Rhu Road, and Dover Drive can potentially yield about 480, 525, and 625 residential units, respectively. These form part of the 4,725 residential units to be released via the Confirmed List of the 2H2025 GLS programme to cater to housing demand and maintain market stability.
3. Details on the three sites can be found in Annex A._
Other Details 4. The tender for the Dairy Farm Walk, Tanjong Rhu Road, and Dover Drive sites will close at 12 noon on 22 January 2026, 5 February 2026, and 26 March 2026, respectively.
1The sites at Dairy Farm Walk and Tanjong Rhu Road are zoned Residential, while the site at Dover Drive is zoned Residential with Commercial at 1st Storey (See Annex A ).
2This site was previously referred to as Dover Road in the 2H2025 GLS Programme announced on 13 June 2025.
Source documents
- Press releasePublished 26 November 2025
URA launches tender for three sale sites at Dairy Farm Walk, Tanjong Rhu Road, and Dover Drive
Urban Redevelopment Authority · Retrieved 18 September 2026
Source fact · Source-backedTechnical details
- SHA-256
- 9c7e611af3ab6f25a9c3d52e002cb18b45af86a2bdf256cd819a1f82efec9c09
- Size
- 436,229 bytes
- Format
- text/html
- Retrieved at
- 2026-09-18 16:56:56 UTC
- Prevo reference
- ura-pr25-61
- AnnexPublished 26 November 2025
Annex A to URA launches tender for three sale sites at Dairy Farm Walk, Tanjong Rhu Road, and Dover Drive
Urban Redevelopment Authority · Retrieved 18 September 2026
Source fact · Source-backedTechnical details
- SHA-256
- 5dcc2836587bd14da7e0ede69cc8447c9e2189a27cf1d04d61b219438c6c7bb2
- Size
- 102,117 bytes
- Format
- application/pdf
- Retrieved at
- 2026-09-18 16:56:56 UTC
- Prevo reference
- ura-pr25-61/pr25-61a2.pdf
- Press releasePublished 22 January 2026
Tender closing for URA sale site at Dairy Farm Walk
Urban Redevelopment Authority · Retrieved 19 September 2026
Source fact · Source-backedTechnical details
- SHA-256
- 2cb80447a0fb756eb93820328c5f174f388a3568b036f6a8feaca86ec1ab0fef
- Size
- 424,607 bytes
- Format
- text/html
- Retrieved at
- 2026-09-19 03:18:05 UTC
- Prevo reference
- ura-pr26-04
- AnnexPublished 22 January 2026
Annex A to Tender closing for URA sale site at Dairy Farm Walk
Urban Redevelopment Authority · Retrieved 19 September 2026
Source fact · Source-backedTechnical details
- SHA-256
- 4a9ad851fbd35b365eeb4cc78383260a58aa31c0520f8c40c508ff18b76162d6
- Size
- 94,528 bytes
- Format
- application/pdf
- Retrieved at
- 2026-09-19 03:18:05 UTC
- Prevo reference
- ura-pr26-04/pr26-04a.pdf











