URA sale site · Confirmed List
Bukit Timah Link
Allowable development: Residential. Built as Bukit Timah Link Residences.
© OpenStreetMap contributors © CARTO
- Launched for tender
- 31 August 2022
- Tender closed
- 3 November 2022
- Awarded
- 15 November 2022
Successful tenderer
Bukit One Pte. Ltd.
S$200,001,888
Awarded 15 November 2022 [ura-pr22-42]
S$1,343
Converted from S$14,457.27 psm GFA, the published rate
4,611.1
As stated on 31 August 2022 [ura-pr22-31/pr22-31a.pdf]
13,834
As stated on 31 August 2022 [ura-pr22-31/pr22-31a.pdf]
160
URA's estimate, not a cap. As stated on 31 August 2022 [ura-pr22-31/pr22-31a.pdf]
What matters about this site
URA sale site of 4,611.1 sqm on a 99-year lease in Bukit Timah. Allowable development, as the record states it: Residential.
Released on the Confirmed List.
Awarded on 15 November 2022 to Bukit One Pte. Ltd for S$200,001,888, from 5 bids at the close. URA estimated about 160 homes.
Investigate this site
Developer rules in force at the close
The developer rules Prevo records as in force on 3 November 2022, when this tender closed, and the event that set each. Whether one applied to a bidder depends on the bidder and the development.
- Singapore raises ABSD, tightens TDSR to 55% and lowers HDB loan LTV to 85%
ABSD for housing developers
Overview
The site particulars in force on the reading date, each with the document that stated it. A cap is labelled as a cap and an estimate as an estimate; a figure the annex did not give is absent.
- Selling authority
- URA
- Allowable development
- Residential
- Tenure
- 99 years
- Programme list
- Confirmed List, launched for tender[ura-pr22-31/pr22-31a.pdf]
- Site area
- 4,611.1 sqm[ura-pr22-31/pr22-31a.pdf]
- Maximum GFA
- 13,834 sqm[ura-pr22-31/pr22-31a.pdf]
- Estimated housing units
- 160[ura-pr22-31/pr22-31a.pdf]
- Height control
- Maximum 20 storeys; technical height 153m SHD[ura-pr22-31/pr22-31a.pdf]
- Facts as stated on
- 31 August 2022
Tender
Milestones on record
Programme: Confirmed List, launched for tender, as stated on 31 August 2022. Being on a list is not a tender launch: a launch is the release that reports one.
- 31 August 2022Launched for tender release
- 3 November 2022Tender closed release
- 15 November 2022Awarded release
How the bids compared
5 tender groups submitted 5 bids at the close on 3 November 2022.
The tender was awarded on 15 November 2022 at S$200,001,888, S$27,113,000 (15.68%) above the next tender group's bid of S$172,888,888.
Valid bids ranged from S$138,485,000 to S$200,001,888.
5
S$27,113,000
Winning bid minus the next tender group's (Winchamp Investment Pte. Ltd, rank 2), as a share of that bid.
S$61,516,888
Highest minus lowest valid bid, as a share of the lowest.
- Bukit One Pte. Ltd.AwardedS$200,001,888S$1,343 psf ppr
- Winchamp Investment Pte. Ltd.S$172,888,888S$1,161 psf ppr
- Sims Park Pte LtdS$161,777,000S$1,086 psf ppr
- Sing Holdings LimitedS$155,200,000S$1,042 psf ppr
- TID Residential Pte. Ltd.S$138,485,000S$930 psf ppr
S$200,001,888
S$14,457.27 psm GFA, about S$1,343 psf ppr (derived). Awarded 15 November 2022 to Bukit One Pte. Ltd.
| Location | Allowable development | Site area | Maximum permissible GFA | Successful tenderer | Tendered price (S$ psm of GFA) |
|---|---|---|---|---|---|
| Bukit Timah Link | Residential | 4,611.1 m² | 13,834 m² | Bukit One Pte. Ltd. | S$200,001,888(S$14,457.27) |
As listed at the close of 3 November 2022 (ura-pr22-40), with the outcome the award of 15 November 2022 gave each.
| Rank | Tenderer | Tendered price | S$ psm GFA | S$ psf ppr (derived) | Outcome |
|---|---|---|---|---|---|
| 1 | Bukit One Pte. Ltd. | S$200,001,888 | S$14,457.27 | S$1,343 | Awarded |
| 2 | Winchamp Investment Pte. Ltd. | S$172,888,888 | S$12,497.39 | S$1,161 | Unsuccessful |
| 3 | Sims Park Pte Ltd | S$161,777,000 | S$11,694.16 | S$1,086 | Unsuccessful |
| 4 | S$155,200,000 | S$11,218.74 | S$1,042 | Unsuccessful | |
| 5 | S$138,485,000 | S$10,010.48 | S$930 | Unsuccessful |
Comparable land sales
Reading comparable land sales…
Location
- Parcel
- Boundary published in URA's sale-site layer, drawn at the top of the page.
- Planning area
- Bukit Timah, as URA's sale-site layer gives it.
- Built as
- Bukit Timah Link Residences, the development the map's lookup joins to this site.
- On the map
- View on Map for the parcel in its surroundings: Master Plan land use, transport, nearby sale sites and developments.
Developments nearby
Finding developments nearby…
The market when bids closed
When bids closed on 3 November 2022, URA's latest quarterly figures were for 3Q2022, published 28 October 2022, 6 days earlier. The next release, 4Q2022, came on 27 January 2023. The table carries on through four releases after it.
Swipe the table sideways for every quarter
| Private residential | 1Q2022Apr 2022 | 2Q2022Jul 2022 | On the day3Q2022Oct 2022 | 4Q2022Jan 2023 | 1Q2023Apr 2023 | 2Q2023Jul 2023 | 3Q2023Oct 2023 | Trend | Change3Q2022 to 3Q2023 |
|---|---|---|---|---|---|---|---|---|---|
| Prices | |||||||||
| Private home price index | 174.8 | 180.9 | 187.8 | 188.6 | 194.8 | 194.4 | 196.0 | +4.4% | |
| Non-landed, core central region | 138.6 | 141.2 | 144.4 | 145.4 | 146.6 | 146.5 | 142.5 | −1.3% | |
| Private rental index | 119.0 | 127.0 | 137.9 | 148.1 | 158.8 | 163.2 | 164.5 | +19.3% | |
| Sales | |||||||||
| New homes sold by developers | 1,825 | 2,397 | 2,187 | 690 | 1,256 | 2,127 | 1,946 | −11.0% | |
| Resales | 3,377 | 4,236 | 3,719 | 2,694 | 2,622 | 2,976 | 2,900 | −22.0% | |
| Sub-sales | 141 | 178 | 242 | 204 | 243 | 285 | 355 | +46.7% | |
| Units launched | 613 | 1,956 | 1,455 | 504 | 1,312 | 2,374 | 2,805 | +92.8% | |
| Supply | |||||||||
| Unsold, uncompleted, with planning approval | 14,087 | 15,805 | 15,677 | 16,024 | 16,252 | 17,484 | 16,747 | +6.8% | |
| Pipeline with planning approval | 47,415 | 48,836 | 49,384 | 46,041 | 44,846 | 44,157 | 36,949 | −25.2% | |
| Vacancy rate | 5.3% | 5.4% | 5.7% | 5.5% | 6.0% | 6.3% | 8.4% | +2.7 pts | |
Each figure is the quarter's own value as URA printed it in that quarter's release, not as later revised. Select a figure to see the annex and page it comes from.
Held back: URA prints the number in more than one place and the table's labels do not settle which one it is, so the archive stores it but does not show it.
Analyse in Studio
Start a preliminary feasibility study from this site in Prevo Studio. It is a working model for your own assumptions, not a valuation, an approval or a completed feasibility.
Carried from this record
- Site boundary
- From the agency's sale-site layer
- Site area
- 4,611.1 sqm
- Maximum GFA
- 13,834 sqm
- Tenure
- 99-year lease
- Land price
- S$200,001,888, the awarded bid
- Comparable land sales
- Read again by the same rules on the study's own date, so a study begun today may hold later awards than this page
You confirm in Studio
- The cadastral lots under the sale boundary, before planning controls are read from them.
- Zoning, plot ratio and height controls, read from the Master Plan layers; each one Studio cannot settle is marked for you to enter.
- The selling price: Studio offers an estimate from nearby new sales, labelled as an estimate, for you to replace.
- Construction costs, unit mix and the other scheme assumptions.
Sources
Every release that touched the site, latest first, each on its own date with its text folded beneath, then the documents behind the page.
15 November 2022
AwardedAward of tender for URA sale sites at Hillview Rise and Bukit Timah Link
Awarded to
Bukit One Pte. Ltd., S$200,001,888 (S$14,457.27 psm GFA, about S$1,343 psf ppr).
Read the press releaseHide the press releaseura-pr22-42
The Urban Redevelopment Authority (URA) has awarded the tenders for the sites at Hillview Rise and Bukit Timah Link to the highest tenderers, namely Far East Civil Engineering (Pte.) Limited and Sekisui House, Ltd. for the site at Hillview Rise; and Bukit One Pte. Ltd. for the site at Bukit Timah Link.
The sites at Hillview Rise and Bukit Timah Link were launched for tender on 31 August 2022. The tenders for these sites closed on 3 November 2022. The sites were offered for sale on 99-year lease terms.
Details of the awarded sites and the successful tenderers are provided below:
Table caption
| LOCATION | ALLOWABLE DEVELOPMENT | SITE AREA | MAXIMUM PERMISSIBLE GROSS FLOOR AREA (GFA) | SUCCESSFUL TENDERER | TENDERED PRICE ($PSM of GFA) |
|---|---|---|---|---|---|
| Hillview Rise | Residential | 10,395.2 m² | 29,107 m² | Far East Civil Engineering (Pte.) Limited and Sekisui House, Ltd. | $320,777,000 ($11,020.61) |
| Bukit Timah Link | 4,611.1 m² | 13,834 m² | Bukit One Pte. Ltd. | $200,001,888 ($14,457.27) |
3 November 2022
Tender closedTender closing for URA sale sites at Hillview Rise and Bukit Timah Link
5 bids disclosed
Highest S$200,001,888 (S$14,457.27 psm GFA) from Bukit One Pte. Ltd.
Read the press releaseHide the press releaseura-pr22-40
The Urban Redevelopment Authority (URA) closed the tender for the two sites at Hillview Rise and Bukit Timah Link today.
The public tender for the two sites at Hillview Rise and Bukit Timah Link were launched on 31 August 2022.
Please see Annex A and B for details of the sites and tender bids received.
This is not an announcement of tender award. A decision on the award of the tender will be made after the bids have been evaluated. This will be publicised at a later date.
31 August 2022
Launched for tenderURA launches tender for two residential sites at Bukit Timah Link and Hillview Rise
Read the press releaseHide the press releaseura-pr22-31
The Urban Redevelopment Authority (URA) has released two residential sites at Bukit Timah Link and Hillview Rise for sale today under the Confirmed List of the second half 2022 (2H2022) Government Land Sales (GLS) Programme. Together, these two sites can yield about 495 residential units.
Details of the land parcels can be found in Annex 1 and the location plans are in Annex 2.
**Other Details
The tender for the Bukit Timah Link and Hillview Rise sites will close at 12 noon on 3 November 2022.
Source documents
- Press releasePublished 31 August 2022
URA launches tender for two residential sites at Bukit Timah Link and Hillview Rise
Urban Redevelopment Authority · Retrieved 18 September 2026
Source fact · Source-backedTechnical details
- SHA-256
- 53b18d4970f7632b28598f89558f70e4cdfac0b42d040fde4c7f37400fa187b6
- Size
- 430,234 bytes
- Format
- text/html
- Retrieved at
- 2026-09-18 12:12:39 UTC
- Prevo reference
- ura-pr22-31
- AnnexPublished 31 August 2022
Annex 1 to URA launches tender for two residential sites at Bukit Timah Link and Hillview Rise
Urban Redevelopment Authority · Retrieved 18 September 2026
Source fact · Source-backedTechnical details
- SHA-256
- 953c564202a1ff4c8fb12fbb5fff814eceeec68e59aae9582e6b8ce40af1fa17
- Size
- 11,878 bytes
- Format
- application/pdf
- Retrieved at
- 2026-09-18 12:12:39 UTC
- Prevo reference
- ura-pr22-31/pr22-31a.pdf
- AnnexPublished 31 August 2022
Annex 2 to URA launches tender for two residential sites at Bukit Timah Link and Hillview Rise
Urban Redevelopment Authority · Retrieved 18 September 2026
Source fact · Source-backedTechnical details
- SHA-256
- 967d050a9d4faf0d9465c940bbb629e1c39c9f174f58e218b77a20e2d3e00dcc
- Size
- 269,808 bytes
- Format
- application/pdf
- Retrieved at
- 2026-09-18 12:12:39 UTC
- Prevo reference
- ura-pr22-31/pr22-31b.pdf
- Press releasePublished 3 November 2022
Tender closing for URA sale sites at Hillview Rise and Bukit Timah Link
Urban Redevelopment Authority · Retrieved 18 September 2026
Source fact · Source-backedTechnical details
- SHA-256
- 51c052c169b422aa3a403ffd288ef5ad518e327aeaf1e290a0584f185603a765
- Size
- 423,432 bytes
- Format
- text/html
- Retrieved at
- 2026-09-18 12:12:40 UTC
- Prevo reference
- ura-pr22-40
- AnnexPublished 3 November 2022
Annex A to Tender closing for URA sale sites at Hillview Rise and Bukit Timah Link
Urban Redevelopment Authority · Retrieved 18 September 2026
Source fact · Source-backedTechnical details
- SHA-256
- 42afa435baf9bd36c075b006027fc4e2c544a232f7569db487a53e2cd7a9a522
- Size
- 6,369 bytes
- Format
- application/pdf
- Retrieved at
- 2026-09-18 12:12:40 UTC
- Prevo reference
- ura-pr22-40/pr22-40a.pdf
- AnnexPublished 3 November 2022
Annex B to Tender closing for URA sale sites at Hillview Rise and Bukit Timah Link
Urban Redevelopment Authority · Retrieved 18 September 2026
Source fact · Source-backedTechnical details
- SHA-256
- fadf732bdac53dbc118d444e30080ce2dd13b90e15930c945bd7b1aa75109b1e
- Size
- 6,346 bytes
- Format
- application/pdf
- Retrieved at
- 2026-09-18 12:12:40 UTC
- Prevo reference
- ura-pr22-40/pr22-40b.pdf
- Press releasePublished 15 November 2022
Award of tender for URA sale sites at Hillview Rise and Bukit Timah Link
Urban Redevelopment Authority · Retrieved 18 September 2026
Source fact · Source-backedTechnical details
- SHA-256
- 8b3269487c2d279cf7d121aae1e0ea579215f2014a6afec94fc3fae82afc2a09
- Size
- 455,834 bytes
- Format
- text/html
- Retrieved at
- 2026-09-18 12:12:40 UTC
- Prevo reference
- ura-pr22-42















