URA sale site · Confirmed List, 2H2026
Tanjong Rhu Close
Allowable development: Residential.
© OpenStreetMap contributors © CARTO
- Launched for tender, Confirmed List
- 26 November 2026
- Tender scheduled to close
- 2 February 2027
Tender outcome
Open for tender, scheduled to close 2 February 2027. No bids are published until the close.
12,319.3
As stated on 26 November 2026 [ura-pr26-84/pr26-84a.pdf]. Subject to cadastral survey
43,118
As stated on 26 November 2026 [ura-pr26-84/pr26-84a.pdf]
505
URA's estimate, not a cap. As stated on 26 November 2026 [ura-pr26-84/pr26-84a.pdf]
What matters about this site
URA sale site of 12,319.3 sqm on a 99-year lease in Kallang. Allowable development, as the record states it: Residential.
Released on the Confirmed List of the 2H2026 programme.
Open for tender, scheduled to close on 2 February 2027. URA estimated about 505 homes.
Investigate this site
Overview
The site particulars in force on the reading date, each with the document that stated it. A cap is labelled as a cap and an estimate as an estimate; a figure the annex did not give is absent.
- Selling authority
- URA
- Allowable development
- Residential
- Tenure
- 99 years
- Programme list
- Confirmed List (2H2026 programme), launched for tenderThe release names the 2H2026 programme and sets a tender close, and does not say which list. URA's Schedule of Confirmed List Sites, last updated 26 November 2026, lists the parcel as open for tender.[ura-pr26-84/pr26-84a.pdf]
- Site area
- 12,319.3 sqmSubject to cadastral survey, as the annex states.[ura-pr26-84/pr26-84a.pdf]
- Maximum GFA
- 43,118 sqmMinimum GFA 38,806 sqm[ura-pr26-84/pr26-84a.pdf]
- Estimated housing units
- 505[ura-pr26-84/pr26-84a.pdf]
- Height control
- 95 m to 100 m SHD, by zone[ura-pr26-84/pr26-84a.pdf]
- Tender conditions
- Housing yield: The number of units is an estimate; the annex says the actual number may vary. Not a cap.
- Facts as stated on
- 26 November 2026
Tender conditions
What a bidder is held to, as the tender documents state it. Each line says whether the document requires it, encourages it or rules it out, and the clause or plan sheet it is written at. A figure worked out from the printed ones is marked Calculated.
Parcel
What is being sold.
- Location
- Bounded by an upcoming high-rise residential development to the north, Tanjong Rhu Close to the west and Singapore Swimming Club to the east
- Clause 2.1
Quantum
How much may and must be built.
- Maximum GFA
- 43,118 sqm
- Required
- Minimum GFA
- 38,806 sqm90% of the maximum, calculated.
- Required
- Plot ratio
- 3.50Maximum GFA over site area. The tender documents print no plot ratio.
- Calculated
- Bonus GFA
- Additional GFA under incentive schemes is subject to prevailing guidelinesIt may attract Land Betterment Charge.
- Clause 4.2.2
Allowed use
The housing forms the conditions permit.
- Permitted
- Condominium or flats
- RequiredTable 1
- Excluded
- Strata landed houses, Serviced Apartments and Serviced Apartments II (SA2)
- Not allowedTable 1
Height and form
The envelope, and the clearances that go with it.
- High-rise Zone 1
- Up to a technical height control of 95 m SHDThe smaller zone, at the north-east corner as the plan draws it. No area is printed.
- RequiredBuilding Height Plan
- High-rise Zone 2
- Up to a technical height control of 100 m SHDThe larger zone, as the plan draws it. No area is printed.
- RequiredBuilding Height Plan
- Technical height
- The same 95 m to 100 m SHD limitsCovers construction equipment, temporary structures and rooftop structures.
- RequiredClause 4.4.2
- RSAF clearance
- For construction equipment and temporary structures above 71 m SHD
- RequiredClause 4.4.2
- CAAS and DSTA
- Clearance of the total building height and site layout before the Design Gateway submissionCAAS and RSAF written approval before any construction machinery is mobilised.
- RequiredClauses 4.4.3, 4.4.5
- Setbacks
- Under the prevailing Development Control guidelinesThe Control Plan draws road buffers along Tanjong Rhu Close and East Coast Parkway. No distance is printed.
- RequiredClause 4.5.1
- Massing
- Well articulated, with visual porosity across the parcel; no wall-like effect from any elevation
- RequiredClause 4.3.2
Access and parking
Where vehicles and people enter.
- Vehicular access
- From Tanjong Rhu Close, the new local access roadShown indicatively on the plan.
- RequiredClause 4.9.1
- Construction access
- May be taken from the same access point on Tanjong Rhu Close
- Clause 4.9.11
- Parking
- Zone 1 range-based parking provision, in fullThe Tanjong Rhu precinct is gazetted a Zone 4 car-lite area, planned with reduced parking.
- RequiredClause 4.10.2
- Car park structures
- Any at-grade or above-grade car park screened and integrated with the building designMotorcycle lots inside the car parking areas.
- RequiredClauses 4.10.3, 4.10.4
- Service access
- Directly from public roadsAccess to all service areas is taken from within the development.
- Not allowedClause 4.9.3
- Pedestrian side gate
- Along Tanjong Rhu Close at the western boundary, close to the adjoining site to the northTo reach nearby bus stops.
- EncouragedClause 4.11.1
- Delivery riders
- Temporary parking for food delivery riders on motorcycles or active mobility devices
- EncouragedClause 4.9.6
Developer's works
Built at the successful tenderer's own cost, outside the development itself.
- Covered linkway
- 2.4 m wide (1.8 m clear) in the road reserve of Tanjong Rhu CloseFrom the side gate or main entrance, whichever is nearer, to the linkway built by the developer of the adjoining site.
- RequiredClause 5.1.1 a
- Handover
- Complete by the Temporary Occupation Permit, then handed to LTA for maintenance
- RequiredClause 5.1.1 b, c
- Reinstatement
- Any footpath or commuter facility the development works affect
- RequiredClause 5.1.1 d
- By others
- Future bus stops and a bus bay on Tanjong Rhu Road; a covered linkway along the adjoining siteNot the developer's works. Locations indicative.
- Control Plan
Site conditions
What is on and under the land.
- Trees to retain
- Eight trees along the southern part of the parcel: A1, A2, A3, B1, T1, T2, T3 and T4Tree protection zones of 6.5 m, 5 m, 5 m, 5.0 m, 2 m, 2 m, 3.5 m and 3 m. Locations indicative, subject to the developer's survey.
- RequiredClause 4.8.1
- Rail
- Existing MRT tunnel lines and a Railway Safety Zone line drawn north of the parcel, across the adjoining siteLocation and profile indicative.
- Control Plan
- Platform level
- The minimum set by the relevant Competent AuthorityNo level is printed.
- RequiredClause 4.6.1
Construction
How it must be built.
- PPVC
- Module storage and holding space inside the parcelNo space outside the parcel is granted for it.
- RequiredClause 6.3.7
Standard conditions
Clauses URA's residential tender conditions carry in the same words, listed apart from the controls particular to this parcel.
- Development control
- Development Control guidelines apply unless the conditions say otherwise, with a Development Statement of Intent at formal submission
- RequiredClauses 4.1.2, 4.1.3
- State Land
- A Temporary Occupation Licence from SLA for any works on State Land
- RequiredClause 4.1.4
- Underground structures
- The developer carries out its own site investigation for sub-structures and obstructions
- RequiredClause 4.1.5
- Alternative proposals
- An alternative to a planning requirement may be considered, at the Authority's discretion
- Clause 4.1.6
- Roofscape
- Rooftop services screened from the top and all sides; perforated panels at 25% porosity or less, openings no wider than 30 mm
- RequiredClause 4.7
- Loading areas
- Sheltered and enclosed, with loading bay barriers inside the parcel
- RequiredClause 4.9.4
- Bin centre
- The bin centre and its service driveway inside the parcel
- RequiredClauses 4.9.8, 4.9.9
- Public communications plan
- Flyers to the community within about 100 m, with Forms A, B and C, before the Design Gateway submission
- RequiredClause 6.1
- As-built survey
- A certified surveyor's as-built plan to CAAS and DSTA before the Temporary Occupation Permit
- RequiredClause 4.4.6
- Site works
- Works hoarded and screened; State Land reinstated on completion
- RequiredClauses 6.2.7, 6.2.8
Tender
Milestones on record
Programme: Confirmed List, 2H2026, launched for tender, as stated on 26 November 2026. Being on a list is not a tender launch: a launch is the release that reports one.
- 26 November 2026Launched for tender, Confirmed List release
- 2 February 2027Tender scheduled to close (announced 26 November 2026; a date announced, not a close on record)
Scheduled to close 2 February 2027 at 12:00 Singapore time, as announced on 26 November 2026. A date announced, not a close on record: the close is the release that reports it.
No bids are on record. Bids are published when the tender closes.
Comparable land sales
Reading comparable land sales…
Location
- Parcel
- Boundary published in URA's sale-site layer, drawn at the top of the page.
- Planning area
- Kallang, as URA's sale-site layer gives it.
- On the map
- View on Map for the parcel in its surroundings: Master Plan land use, transport, nearby sale sites and developments.
Developments nearby
Finding developments nearby…
Market
No tender close is on record for this site, so there is no market-at-close reading.
Analyse in Studio
Start a preliminary feasibility study from this site in Prevo Studio. It is a working model for your own assumptions, not a valuation, an approval or a completed feasibility.
Carried from this record
- Site boundary
- From the agency's sale-site layer
- Site area
- 12,319.3 sqm
- Maximum GFA
- 43,118 sqm
- Tenure
- 99-year lease
- Land price
- Not carried: no award, so you enter your own
- Comparable land sales
- Read again by the same rules on the study's own date, so a study begun today may hold later awards than this page
You confirm in Studio
- The cadastral lots under the sale boundary, before planning controls are read from them.
- Zoning, plot ratio and height controls, read from the Master Plan layers; each one Studio cannot settle is marked for you to enter.
- The selling price: Studio offers an estimate from nearby new sales, labelled as an estimate, for you to replace.
- Construction costs, unit mix and the other scheme assumptions.
- Your land price: the record holds no award for this site.
Sources
Every release that touched the site, latest first, each on its own date with its text folded beneath, then the documents behind the page.
26 November 2026
Launched for tender, Confirmed ListURA releases two sale sites at De Souza Avenue and Tanjong Rhu Close
Read the press releaseHide the press releaseura-pr26-84
The Urban Redevelopment Authority (URA) has released two residential sites at De Souza Avenue and Tanjong Rhu Close for sale today under the second half 2026 (2H2026) Government Land Sales (GLS) Programme.
The sites at De Souza Avenue and Tanjong Rhu Close can potentially yield about 410 and 505 residential units, respectively. Details on the two sites can be found in Annex A.
Other details -
The tenders for the De Souza Avenue and Tanjong Rhu Close sites will close at 12 noon on 26 January 2027 and 2 February 2027, respectively.
Source documents
- Press releasePublished 26 November 2026
URA releases two sale sites at De Souza Avenue and Tanjong Rhu Close
Urban Redevelopment Authority · Retrieved 26 November 2026
Source fact · Source-backedTechnical details
- SHA-256
- f47dfe7ed080f3db8cebf41dfe9370b5188797f821e909f133ad603d46cf96cf
- Size
- 429,735 bytes
- Format
- text/html
- Retrieved at
- 2026-11-26 07:40:18 UTC
- Prevo reference
- ura-pr26-84
- AnnexPublished 26 November 2026
Annex A to URA releases two sale sites at De Souza Avenue and Tanjong Rhu Close
Urban Redevelopment Authority · Retrieved 26 November 2026
Source fact · Source-backedTechnical details
- SHA-256
- 7dd3c3e143c25f0682924d92d64d8e2096cd1c622f508f4fcdf2da62e01ff67b
- Size
- 83,522 bytes
- Format
- application/pdf
- Retrieved at
- 2026-11-26 07:40:18 UTC
- Prevo reference
- ura-pr26-84/pr26-84a.pdf
- Tender documentPublished 26 November 2026
Location and Control Plans, Tanjong Rhu Close
Urban Redevelopment Authority · Retrieved 25 November 2026
Source fact · Source-backedTechnical details
- SHA-256
- b69cf3e8bc61854b3d924e3d12b8958187ae321a003c43316fb43d050e1cdee3
- Size
- 2,184,345 bytes
- Format
- application/pdf
- Retrieved at
- 2026-11-25 16:00:00 UTC
- Prevo reference
- ura-pr26-84/tanjong-rhu-close-nov26-location-and-control-plans.pdf
- Tender documentPublished 26 November 2026
Technical Conditions of Tender, Tanjong Rhu Close, dated 26 November 2026
Urban Redevelopment Authority · Retrieved 25 November 2026
Source fact · Source-backedTechnical details
- SHA-256
- 5aa2b55775a0b17c80638647cdb546ed8695d8f0d969d76bb9737112a1e920a1
- Size
- 302,217 bytes
- Format
- application/pdf
- Retrieved at
- 2026-11-25 16:00:00 UTC
- Prevo reference
- ura-pr26-84/tanjong-rhu-close-nov26-technical-conditions-of-tender.pdf













