Skip to main content

News Brief: the reporting, attributed to the outlet.

Planning rules: GFA exemptions

Singapore widens GFA exemptions for eaves, covered linkways and basement M&E space

The government said on 26 November 2026 it is easing gross floor area rules, raising the GFA-exempt width of roof eaves and sun-shading devices below the sixth storey to 3 m from 2 m, The Business Times reported.

Prevo Research · Reported 26 November 2026

Reported by The Business Times (Jeanne Mah), 26 November 2026

None of the 23 claims in this story matched one of Prevo's records. It is the outlet's reporting, attributed, not confirmed by Prevo.

Published on Prevo 27 November 2026

Extension

three years

reported

What happened

The government announced on 26 November 2026 that it is easing gross floor area (GFA) rules to give developers more development potential and design leeway, The Business Times reported. With immediate effect, the Urban Redevelopment Authority raises the maximum GFA-exempt width of roof eaves and sun-shading devices below the sixth storey to 3 m from 2 m. Owners may add compliant eaves and sun-shading devices to existing buildings without URA planning approval, though conserved buildings still need permission, the newspaper reported.

Covered linkways become GFA-exempt even outside landscaped areas, with existing greenery and landscape replacement requirements still applying, and the GFA exemption for mechanical and electrical spaces extends from basement car park floors to all basement floors, The Business Times reported. Minister for National Development Chee Hong Tat, speaking at Redas's 67th anniversary dinner, said the government is studying further changes, including the GFA treatment of covered outdoor sports facilities.

The government will also enhance the Green Mark Incentive Scheme for Existing Buildings 2.0, launched in 2022, and extend its application period by three years to 31 March 2030 or until funds are fully committed, the newspaper reported. Additions include a funding pathway for upgrades to individual systems such as chillers and lifts that meet EE55, and support for roof strengthening and alternative cooling covering up to half of qualifying costs, capped at S$200,000 per measure. Mr Chee said the enhancements should shorten average retrofit payback by about two years compared with unfunded projects.

As reported

Jeanne Mah of The Business Times reported that supported retrofit projects are expected to save about 29.5 million kWh a year, roughly the usage of 7,000 four-room HDB flats. Redas welcomed the GFA changes as giving more flexibility to build connected buildings suited to Singapore's climate, and its president Tan Swee Yiow cited a case where AI cut chiller plant energy use by 9 to 15 per cent.

Questions

What changed in Singapore's gross floor area rules in November 2026?

On 26 November 2026 the GFA-exempt width of roof eaves and sun-shading devices below the sixth storey rose to 3 m from 2 m, covered linkways became exempt outside landscaped areas, and M&E exemptions extended to all basement floors, The Business Times reported.

How long is the Green Mark Incentive Scheme for Existing Buildings 2.0 extended?

The application period is extended by three years to 31 March 2030, or until funds are fully committed, whichever comes first, The Business Times reported.

How much funding is available for roof strengthening and alternative cooling?

Extra funding covers up to half of qualifying costs, capped at S$200,000 per measure, The Business Times reported. Mr Chee said the enhancements should shorten average retrofit payback by about two years.

What was reported

23 claims: 17 reported only, 6 no record identifiedShow

Each claim in Prevo's words, as the reporting stated it. None was matched to one of Prevo's records, so none is marked checked.

  • No record identifiedThe government announced on Thursday Nov 26 that it is easing gross floor area rules, giving developers more development potential and design leeway.no Prevo event for this change: a candidate event
  • No record identifiedRelaxations cover wider roof eaves and sun-shading devices, eased covered linkway requirements and extended exemptions for M&E spaces.no Prevo event for this change: a candidate event
  • Reported onlyThe government will raise funding support for energy-efficient retrofits of existing buildings to cut upfront costs and encourage decarbonisation.no kind of Prevo record holds this claim
  • Reported onlyChee said that with limited land and resources Singapore must find innovative ways to optimise space use, speaking at Redas's 67th anniversary dinner.no kind of Prevo record holds this claim
  • Reported onlyChee set three priorities: better use of space, better building sustainability and rejuvenating the city centre, plus creating attractive places.no kind of Prevo record holds this claim
  • No record identifiedEffective immediately, URA raises the maximum GFA-exempt width of roof eaves and sun-shading devices below the sixth storey to 3 m from 2 m.no Prevo event for this change: a candidate event
  • No record identifiedOwners may add eaves and sun-shading devices to existing buildings without URA planning approval if compliant; conserved buildings still need permission.no Prevo event for this change: a candidate event
  • No record identifiedCovered linkways become GFA-exempt even outside landscaped areas, though existing greenery and landscape replacement requirements still apply.no Prevo event for this change: a candidate event
  • No record identifiedGFA exemption for M&E spaces extends from basement car park floors to all basement floors, freeing ground-floor space.no Prevo event for this change: a candidate event
  • Reported onlyThe government is studying further enhancements, including GFA treatment of covered outdoor sports facilities.no kind of Prevo record holds this claim
  • Reported onlyThe changes should lift projects' development potential, yielding more saleable or lettable GFA after exemptions.not checked: a forecast
  • Reported onlyRedas welcomed URA's GFA exemption enhancements as giving more flexibility to build connected buildings suited to Singapore's climate.
  • Reported onlyThe government will enhance the Green Mark Incentive Scheme for Existing Buildings 2.0, launched in 2022 to offset retrofit costs.no kind of Prevo record holds this claim
  • Reported onlySupported projects are expected to save about 29.5 million kWh a year, roughly the usage of 7,000 four-room HDB flats.no kind of Prevo record holds this claim
  • Reported onlyChee noted retrofits need large upfront investment and savings may take several years to materialise.no kind of Prevo record holds this claim
  • Reported onlyTan cited a case where AI cut chiller plant energy use by 9 to 15 per cent and air-handling energy by over 40 per cent.no kind of Prevo record holds this claim
  • Reported onlyA new funding pathway covers upgrades to individual systems like chillers and lifts without whole-building certification if they meet EE55.no kind of Prevo record holds this claim
  • Reported onlyExtra funding for roof strengthening for solar and alternative cooling covers up to half of qualifying costs, capped at S$200,000 per measure.no kind of Prevo record holds this claim
  • Reported onlyAdditional funding goes to owners collaborating with tenants on energy management such as green leases, monitoring and rebate programmes.no kind of Prevo record holds this claim
  • Reported onlyThe enhancements should shorten average retrofit payback by about two years versus unfunded projects.not checked: a forecast
  • Reported onlyThe scheme's application period is extended three years to Mar 31, 2030, or until funds are fully committed, whichever comes first.no kind of Prevo record holds this claim
  • Reported onlyTan said AI will change what is built and how work is done; making young talent AI-ready is a further challenge.no kind of Prevo record holds this claim
  • Reported onlyTan urged members to keep hiring young professionals, pair them with mentors and offer clear growth paths.not checked: an opinion