[ Land sales ]

Zion Road (Parcel A)

Awarded

Residential with commercial at 1st storey, including long-stay serviced apartments. URA sale site, built as Zyon Galleria.

[ Award ]

S$1,106,888,000

S$12,937.43 psm GFA, about S$1,202 psf ppr (derived). Awarded 16 April 2024 to CDL-MFA Vega Property Pte. Ltd., parent: City Developments Limited and CDL-MFA Altair Property Pte. Ltd., parent: City Developments Limited

LocationAllowable developmentSite areaMaximum permissible GFASuccessful tendererTendered price (S$ psm of GFA)
Zion Road (Parcel A)Residential with commercial at 1st storey, including long-stay serviced apartments15,277.9 m²85,557 m²CDL-MFA Vega Property Pte. Ltd., parent: City Developments Limited and CDL-MFA Altair Property Pte. Ltd., parent: City Developments LimitedS$1,106,888,000(S$12,937.43)
[ The one tender received ]

As listed at the close of 4 April 2024 (ura-pr24-12), with the outcome the award of 16 April 2024 gave each.

RankTendererTendered priceS$ psm GFAS$ psf ppr (derived)Outcome
1CDL-MFA Vega Property Pte. Ltd., parent: City Developments Limited and CDL-MFA Altair Property Pte. Ltd., parent: City Developments LimitedS$1,106,888,000S$12,937.43S$1,202Awarded

Press releases, latest first

Each card is one release on its own date, with its text folded beneath. The latest is first and open.

16 April 2024

Awarded

Tender award for URA sale sites at Zion Road (Parcel A) and Upper Thomson Road (Parcel B)

Awarded to

CDL-MFA Vega Property Pte. Ltd., parent: City Developments Limited and CDL-MFA Altair Property Pte. Ltd., parent: City Developments Limited, S$1,106,888,000 (S$12,937.43 psm GFA, about S$1,202 psf ppr).

Read the press releaseura-pr24-15

This article has been migrated from an earlier version of the site and may display formatting inconsistencies.

The Urban Redevelopment Authority (URA) has awarded the tender for the site at Zion Road (Parcel A) to CDL-MFA Vega Property Pte. Ltd. and CDL-MFA Altair Property Pte. Ltd., and the tender for the site at Upper Thomson Road (Parcel B) to GuocoLand (Singapore) Pte. Ltd. and Intrepid Investments Pte. Ltd.

The tenders for these sites were launched on 4 December 2023 and closed on 4 April 2024. The sites were offered for sale on 99-year lease terms.

Details of the awarded sites and the successful tenderers are provided below:

Table caption

LOCATIONALLOWABLE DEVELOPMENTSITE AREAMAXIMUM PERMISSIBLE GROSS FLOOR AREA (GFA)SUCCESSFUL TENDERERTENDERED PRICE ($PSM of GFA)
Zion Road (Parcel A)Residential with Commercial at 1st Storey15,277.9 m²85,557 m² *CDL-MFA Vega Property Pte. Ltd. and CDL-MFA Altair Property Pte. Ltd.$1,106,888,000.00 ($12,937.43)
Upper Thomson Road (Parcel B)Residential32,023.7 m²80,060 m²GuocoLand (Singapore) Pte. Ltd. and Intrepid Investments Pte. Ltd.$779,555,000.00 ($9,737.13)

*A minimum 20,000 m² of GFA is to be set aside for Long-Stay Serviced Apartments (SA2) use

4 April 2024

Tender closed

Tender closing for URA sale sites at Zion Road (Parcel A) and Upper Thomson Road (Parcel B)

1 bid disclosed

Highest S$1,106,888,000 (S$12,937.43 psm GFA) from CDL-MFA Vega Property Pte. Ltd., parent: City Developments Limited and CDL-MFA Altair Property Pte. Ltd., parent: City Developments Limited

Read the press releaseura-pr24-12

This article has been migrated from an earlier version of the site and may display formatting inconsistencies.

The Urban Redevelopment Authority (URA) closed the tender for the two sites at Zion Road (Parcel A) and Upper Thomson Road (Parcel B) today.

The public tender for the two sites at Zion Road (Parcel A) and Upper Thomson Road (Parcel B) was launched on 04 December 2023.

Please see Annex A and B for details of the sites and tender bids received.

This is not an announcement of tender award. A decision on the award of the tender will be made after the bids have been evaluated. This will be publicised at a later date.

4 December 2023

Launched for tender, Confirmed List

URA releases sale sites at Zion Road and Upper Thomson Road with a new rental housing typology, as part of continuous efforts to cater to diverse housing needs

Read the press releaseura-pr23-48

This article has been migrated from an earlier version of the site and may display formatting inconsistencies.

-

To cater to the rising private housing rental demand, two sites — Zion Road Parcel A and Upper Thomson Road Parcel A — are launched to pilot long-stay Serviced Apartments with a 3-month minimum stay requirement1.

-

The Government has released more than 9,000 residential units on the Confirmed List in the whole of 2023 (including long-stay Serviced Apartments), which is the highest in a decade. Increase in release for private housing supply (including long-stay Serviced Apartments) for upcoming GLS programmes will address both purchase and rental demand, while promoting market stability.

The Urban Redevelopment Authority (URA) has released four residential sites at Upper Thomson Road (Parcels A & B) and Zion Road (Parcels A & B) for sale today under the second half 2023 (2H2023) Government Land Sales (GLS) Programme. The sites at Upper Thomson Road (Parcels A & B) and Zion Road (Parcel A) are launched for sale under the Confirmed List, and can potentially yield a total of 2,750 units (including long-stay Serviced Apartments), while Zion Road (Parcel B) is available for application under the Reserve List with a potential yield of 610 residential units. Together, these four sites can potentially yield 3,360 residential units (including long-stay Serviced Apartments).

New Long-stay Serviced Apartments While homeownership aspirations among Singaporeans remain strong, there is a segment of the population that opts to rent. This includes some younger Singaporeans who may choose to rent as a start. Singaporeans who are awaiting the completion of their new or renovated homes, as well as those who come to study or work in Singapore may also seek rental housing. While Serviced Apartments partially cater to this demand, potential tenants who need to rent Serviced Apartments for longer durations would have to compete with those seeking shorter stays, including tourists and business travellers. We have thus consulted the industry extensively on options to cater to such longer-term housing needs.

To expand the range of housing options available and ensure Serviced Apartments can be more targeted in meeting demand for longer stays, the Government will be releasing sites for a new category of long-stay Serviced Apartments with a 3-month minimum stay requirement. Similar to existing Serviced Apartments with a 7-day minimum stay requirement, these long-stay Serviced Apartments cannot be strata subdivided for sale.

The two Confirmed List sites at Upper Thomson Road (Parcel A) and Zion Road (Parcel A) will have a potential combined yield of around 535 long-stay Serviced Apartments, and around 1,275 conventional residential units. Both sites are located near to existing MRT stations and will provide residents with easy access to the city centre, employment nodes, and various amenities. The injection of rental housing supply from the release of such sites will complement conventional rental housing in the market to cater to different needs and help ensure a healthy rental supply.

New neighbourhood in Springleaf Precinct A new neighbourhood will soon be introduced to the Springleaf Precinct with the launch of Upper Thomson Road (Parcels A & B) for sale. Current and future residents can look forward to more amenities in the area, as well as improved pedestrian accessibility to the new Springleaf MRT station.

As the sites are close to the Central Catchment Nature Reserve, a biodiversity-sensitive development approach was taken for these sites. The conserved building of the former Seletar Institute is also situated at the location. Bearing in mind the ecological context as well as the heritage of the area, agencies have conducted extensive environmental and consultancy studies to guide development plans. The findings from the studies as well as plans for the precinct were exhibited as part of the Long-Term Plan Review. Engagements and consultations were conducted with nature and heritage groups, as well as the local community, which aided in drawing up plans for the new neighbourhood. The findings and feedback guided plans to ensure that impact on the surrounding biodiversity is minimised and ecological connectivity is safeguarded in the area. Refer to Annex 1 for details of the land parcels and this link for more information on the biodiversity-sensitive development approach for the precinct.

The successful tenderers for Upper Thomson Road (Parcels A & B) will be required to incorporate biodiversity-sensitive urban design strategies in their proposed developments. They are also strongly encouraged to propose innovative proposals that meet or exceed typical planning and urban design requirements. In addition, the successful tenderer for Upper Thomson Road (Parcel B) will be required to sensitively integrate the conserved building of the former Seletar Institute with the proposed development to preserve the heritage and identity of the area.

Sites are part of increased GLS supply in 2023 In total, the Government has released more than 9,000 Confirmed List units in the whole of 2023 (including long-stay Serviced Apartments), which is the highest in a decade. This is also around 50% higher than the supply in 2022, and around 2.5 times the supply in 2021. More private housing supply, including long-stay Serviced Apartments, will be released in upcoming GLS programmes to cater to purchase and rental demand.

Other Details The tenders for Upper Thomson Road (Parcel B) and Zion Road (Parcel A) sites will close at 12 noon on 4 April 2024 while that for Upper Thomson Road (Parcel A) will close on 19 June 2024.

Upper Thomson Road (Parcels A & B) and Zion Road (Parcel A)

More information on planning guidelines for long-stay Serviced Apartments is available via the circular issued by URA dated 4 December 2023 – “Guidelines for Serviced Apartments II (SA2)”.

1These will be known officially as the Serviced Apartments II (SA2) typology.

2Of these, two are zoned Residential and the other two are zoned Residential with Commercial at 1st Storey (see Annex 1).

Site facts

Selling authority
URA
Allowable development
Residential with commercial at 1st storey, including long-stay serviced apartments
Tenure
99 years
Programme list
Confirmed List, tender closed[ura-pr24-12/pr24-12a.pdf]
Site area
15,277.9 sqm[ura-pr24-12/pr24-12a.pdf]
Maximum GFA
85,557 sqm
  • Minimum 20,000 sqm long-stay serviced apartments (SA2)
  • Minimum 600 sqm childcare centre
[ura-pr24-12/pr24-12a.pdf]
Estimated housing units
1,170[ura-pr24-12/pr24-12a.pdf]
Height control
Low-rise 4 storeys; high-rise zone 1 at 36 storeys; high-rise zone 2 at 240m SHD[ura-pr24-12/pr24-12a.pdf]
Tender conditions
  • Conventional residential units: 735 units
  • Long-stay serviced apartments (SA2): minimum units: 435 units
  • Long-stay serviced apartments (SA2): maximum units: 500 units
  • Table estimate of 1,170 units: Inclusive of 435 SA2 units; the SA2 count is a range and the total is not fixed
  • Long-stay serviced apartments (SA2): minimum tenancy: 3 months
  • Long-stay serviced apartments (SA2): strata subdivision for sale: Prohibited
Facts as stated on
4 April 20242 versions on record: 4 December 2023, 4 April 2024. Each is kept; the one in force on the reading date is shown.

The market when bids closed

When bids closed on 4 April 2024, URA's latest quarterly figures were for 4Q2023, published 26 January 2024, 69 days earlier. The next release, 1Q2024, came on 26 April 2024. The table carries on through four releases after it.

Private residential2Q2023Jul 20233Q2023Oct 2023On the day4Q2023Jan 20241Q2024Apr 20242Q2024Jul 20243Q2024Oct 20244Q2024Jan 2025TrendChange4Q2023 to 4Q2024
Prices
Private home price index194.4196.0201.5204.3206.1204.7209.4+3.9%
Non-landed, core central region146.5142.5148.1153.1152.6150.9154.8+4.5%
Private rental index163.2164.5161.0157.9156.6157.9157.9−1.9%
Sales
New homes sold by developers2,1271,9461,0921,1647251,1603,420+213.2%
Resales2,9762,9002,8312,6893,8023,8603,702+30.8%
Sub-sales285355411377388352311−24.3%
Units launched2,3742,8051,0601,3046341,2843,425+223.1%
Supply
Unsold, uncompleted, with planning approval17,48416,74716,92919,93619,94019,405+14.6%
Pipeline with planning approval44,15736,94934,25138,16737,76835,47535,305+3.1%
Vacancy rate6.3%8.4%8.1%6.8%6.1%held6.6%−1.5 pts
SourceSelect a figure to see where URA printed it.
Latest release on the dayBids closedheldHeld back

Each figure is the quarter's own value as URA printed it in that quarter's release, not as later revised. Select a figure to see the annex and page it comes from.

Held back: URA prints the number in more than one place and the table's labels do not settle which one it is, so the archive stores it but does not show it.

Sources

  1. Press releasePublished 4 December 2023

    URA releases sale sites at Zion Road and Upper Thomson Road with a new rental housing typology, as part of continuous efforts to cater to diverse housing needs

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    514d0601fb5d11381cf8c9c808b18f7bf54eb247f8c988cc631572c8c8df5dc7
    Size
    464,122 bytes
    Format
    text/html
    Retrieved at
    2026-09-18 14:52:13 UTC
    Prevo reference
    ura-pr23-48
  2. AnnexPublished 4 December 2023

    Annex 1 to URA releases sale sites at Zion Road and Upper Thomson Road with a new rental housing typology, as part of continuous efforts to cater to diverse housing needsVersion v2

    Version v2 of the annex as linked from the release page; the authoritative version. Earlier versions were not supplied and are not in the capture, so supersedes_doc_key is null.

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    1625c116e1ae2fff5491011efef07c89db826d8a2bf4c117471376b4cd6dab1c
    Size
    23,261 bytes
    Format
    application/pdf
    Retrieved at
    2026-09-18 14:52:13 UTC
    Source version
    v2
    Prevo reference
    ura-pr23-48/pr23-48a_v2.pdf
  3. Press releasePublished 4 April 2024

    Tender closing for URA sale sites at Zion Road (Parcel A) and Upper Thomson Road (Parcel B)

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    c19737a0c54674b28757f10db0cd66a9b6d0c308e5fe8f514ef8a8af4c75ee88
    Size
    427,050 bytes
    Format
    text/html
    Retrieved at
    2026-09-18 15:39:36 UTC
    Prevo reference
    ura-pr24-12
  4. AnnexPublished 4 April 2024

    Annex A to Tender closing for URA sale sites at Zion Road (Parcel A) and Upper Thomson Road (Parcel B)

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    597a88a046fa202902bd07fb09be5717b50fbc650a6c6991d2cecfd4ad4fdf74
    Size
    10,095 bytes
    Format
    application/pdf
    Retrieved at
    2026-09-18 15:39:36 UTC
    Prevo reference
    ura-pr24-12/pr24-12a.pdf
  5. AnnexPublished 4 April 2024

    Annex B to Tender closing for URA sale sites at Zion Road (Parcel A) and Upper Thomson Road (Parcel B)

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    cfb098e6f17959cbcb158e344bcbbea7dfb2eefb3c07c7f834ec78f1015026bd
    Size
    9,828 bytes
    Format
    application/pdf
    Retrieved at
    2026-09-18 15:39:36 UTC
    Prevo reference
    ura-pr24-12/pr24-12b.pdf
  6. Press releasePublished 16 April 2024

    Tender award for URA sale sites at Zion Road (Parcel A) and Upper Thomson Road (Parcel B)

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    0431d6de63ed131cd18c5ab06b245dbebdec3cea98b1ef61d95a54d3fbf70347
    Size
    462,414 bytes
    Format
    text/html
    Retrieved at
    2026-09-18 15:39:36 UTC
    Prevo reference
    ura-pr24-15