Skip to main content
Land sales
Reading as of 1 February 2024. Only releases published on or before that date are shown (2 later releases are hidden). Read as of today.

URA sale site · Confirmed List

Upper Thomson Road (Parcel B)

Tender open99-year leaseYishun

Allowable development: Residential. Built as Springleaf Residence.

200 m

© OpenStreetMap contributors © CARTO

Boundary as URA's sale-site layer publishes it. Planning area: Yishun.View on Map
Launched for tender, Confirmed List
4 December 2023

Tender outcome

Open for tender. No bids are published until the close.

Site area

32,023.7sqm

Official source

As stated on 4 December 2023 [ura-pr23-48/pr23-48a_v2.pdf]

Maximum GFA

80,060sqm

Official source

As stated on 4 December 2023 [ura-pr23-48/pr23-48a_v2.pdf]

Estimated housing yield

940homes

Estimate

URA's estimate, not a cap. As stated on 4 December 2023 [ura-pr23-48/pr23-48a_v2.pdf]

What matters about this site

URA sale site of 32,023.7 sqm on a 99-year lease in Yishun. Allowable development, as the record states it: Residential.

Released on the Confirmed List.

Open for tender. URA estimated about 940 homes.

These are recorded site and tender facts. Feasibility, value and future pricing need separate analysis.

Investigate this site

  • View on Map opens the live map on this parcel, with its land use, nearby sites and layers.
  • Analyse site in Studio starts a study from this record's area, GFA, tenure and award. You add the assumptions; it is not a finished or compliant feasibility. Sign-in required.
  • Ask Prevo puts a question about this site in the panel. Nothing is sent until you send it.

Overview

The site particulars in force on the reading date, each with the document that stated it. A cap is labelled as a cap and an estimate as an estimate; a figure the annex did not give is absent.

Selling authority
URA
Allowable development
Residential
Tenure
99 years
Programme list
Confirmed List, launched for tender[ura-pr23-48/pr23-48a_v2.pdf]
Site area
32,023.7 sqm[ura-pr23-48/pr23-48a_v2.pdf]
Maximum GFA
80,060 sqm[ura-pr23-48/pr23-48a_v2.pdf]
Estimated housing units
940[ura-pr23-48/pr23-48a_v2.pdf]
Height control
Low-rise 5 storeys; high-rise 90-100m SHD[ura-pr23-48/pr23-48a_v2.pdf]
Tender conditions
  • Biodiversity-sensitive urban design strategies: Mandatory
  • Conserved former Seletar Institute building: Must be sensitively integrated into the development
Facts as stated on
4 December 2023

Tender

Milestones on record

Programme: Confirmed List, launched for tender, as stated on 4 December 2023. Being on a list is not a tender launch: a launch is the release that reports one.

  1. 4 December 2023Launched for tender, Confirmed List release

No bids are on record as of 1 February 2024. Bids are published when the tender closes.

Comparable land sales

Reading comparable land sales…

Location

Parcel
Boundary published in URA's sale-site layer, drawn at the top of the page.
Planning area
Yishun, as URA's sale-site layer gives it.
Built as
Springleaf Residence, the development the map's lookup joins to this site.
On the map
View on Map for the parcel in its surroundings: Master Plan land use, transport, nearby sale sites and developments.

Developments nearby

Finding developments nearby…

Market

No tender close is on record for this site, so there is no market-at-close reading.

Analyse in Studio

Start a preliminary feasibility study from this site in Prevo Studio. It is a working model for your own assumptions, not a valuation, an approval or a completed feasibility.

Carried from this record

Site boundary
From the agency's sale-site layer
Site area
32,023.7 sqm
Maximum GFA
80,060 sqm
Tenure
99-year lease
Land price
Not carried: no award, so you enter your own
Comparable land sales
Read again by the same rules on the study's own date, so a study begun today may hold later awards than this page

You confirm in Studio

  • The cadastral lots under the sale boundary, before planning controls are read from them.
  • Zoning, plot ratio and height controls, read from the Master Plan layers; each one Studio cannot settle is marked for you to enter.
  • The selling price: Studio offers an estimate from nearby new sales, labelled as an estimate, for you to replace.
  • Construction costs, unit mix and the other scheme assumptions.
  • Your land price: the record holds no award for this site.
Analyse this site in StudioSign in required. A study is visible only to you unless you share its report.

This page reads the record as of 1 February 2024. A study reads it as it stands today, so what it carries can differ from what is listed above.

Sources

Every release that touched the site, latest first, each on its own date with its text folded beneath, then the documents behind the page.

4 December 2023

Launched for tender, Confirmed List

URA releases sale sites at Zion Road and Upper Thomson Road with a new rental housing typology, as part of continuous efforts to cater to diverse housing needs

Read the press releaseura-pr23-48

To cater to the rising private housing rental demand, two sites — Zion Road Parcel A and Upper Thomson Road Parcel A — are launched to pilot long-stay Serviced Apartments with a 3-month minimum stay requirement1.

The Government has released more than 9,000 residential units on the Confirmed List in the whole of 2023 (including long-stay Serviced Apartments), which is the highest in a decade. Increase in release for private housing supply (including long-stay Serviced Apartments) for upcoming GLS programmes will address both purchase and rental demand, while promoting market stability.

The Urban Redevelopment Authority (URA) has released four residential sites at Upper Thomson Road (Parcels A & B) and Zion Road (Parcels A & B) for sale today under the second half 2023 (2H2023) Government Land Sales (GLS) Programme. The sites at Upper Thomson Road (Parcels A & B) and Zion Road (Parcel A) are launched for sale under the Confirmed List, and can potentially yield a total of 2,750 units (including long-stay Serviced Apartments), while Zion Road (Parcel B) is available for application under the Reserve List with a potential yield of 610 residential units. Together, these four sites can potentially yield 3,360 residential units (including long-stay Serviced Apartments).

New Long-stay Serviced Apartments While homeownership aspirations among Singaporeans remain strong, there is a segment of the population that opts to rent. This includes some younger Singaporeans who may choose to rent as a start. Singaporeans who are awaiting the completion of their new or renovated homes, as well as those who come to study or work in Singapore may also seek rental housing. While Serviced Apartments partially cater to this demand, potential tenants who need to rent Serviced Apartments for longer durations would have to compete with those seeking shorter stays, including tourists and business travellers. We have thus consulted the industry extensively on options to cater to such longer-term housing needs.

To expand the range of housing options available and ensure Serviced Apartments can be more targeted in meeting demand for longer stays, the Government will be releasing sites for a new category of long-stay Serviced Apartments with a 3-month minimum stay requirement. Similar to existing Serviced Apartments with a 7-day minimum stay requirement, these long-stay Serviced Apartments cannot be strata subdivided for sale.

The two Confirmed List sites at Upper Thomson Road (Parcel A) and Zion Road (Parcel A) will have a potential combined yield of around 535 long-stay Serviced Apartments, and around 1,275 conventional residential units. Both sites are located near to existing MRT stations and will provide residents with easy access to the city centre, employment nodes, and various amenities. The injection of rental housing supply from the release of such sites will complement conventional rental housing in the market to cater to different needs and help ensure a healthy rental supply.

New neighbourhood in Springleaf Precinct A new neighbourhood will soon be introduced to the Springleaf Precinct with the launch of Upper Thomson Road (Parcels A & B) for sale. Current and future residents can look forward to more amenities in the area, as well as improved pedestrian accessibility to the new Springleaf MRT station.

As the sites are close to the Central Catchment Nature Reserve, a biodiversity-sensitive development approach was taken for these sites. The conserved building of the former Seletar Institute is also situated at the location. Bearing in mind the ecological context as well as the heritage of the area, agencies have conducted extensive environmental and consultancy studies to guide development plans. The findings from the studies as well as plans for the precinct were exhibited as part of the Long-Term Plan Review. Engagements and consultations were conducted with nature and heritage groups, as well as the local community, which aided in drawing up plans for the new neighbourhood. The findings and feedback guided plans to ensure that impact on the surrounding biodiversity is minimised and ecological connectivity is safeguarded in the area. Refer to Annex 1 for details of the land parcels and this link for more information on the biodiversity-sensitive development approach for the precinct.

The successful tenderers for Upper Thomson Road (Parcels A & B) will be required to incorporate biodiversity-sensitive urban design strategies in their proposed developments. They are also strongly encouraged to propose innovative proposals that meet or exceed typical planning and urban design requirements. In addition, the successful tenderer for Upper Thomson Road (Parcel B) will be required to sensitively integrate the conserved building of the former Seletar Institute with the proposed development to preserve the heritage and identity of the area.

Sites are part of increased GLS supply in 2023 In total, the Government has released more than 9,000 Confirmed List units in the whole of 2023 (including long-stay Serviced Apartments), which is the highest in a decade. This is also around 50% higher than the supply in 2022, and around 2.5 times the supply in 2021. More private housing supply, including long-stay Serviced Apartments, will be released in upcoming GLS programmes to cater to purchase and rental demand.

Other Details The tenders for Upper Thomson Road (Parcel B) and Zion Road (Parcel A) sites will close at 12 noon on 4 April 2024 while that for Upper Thomson Road (Parcel A) will close on 19 June 2024.

Upper Thomson Road (Parcels A & B) and Zion Road (Parcel A)

More information on planning guidelines for long-stay Serviced Apartments is available via the circular issued by URA dated 4 December 2023 – “Guidelines for Serviced Apartments II (SA2)”.

1These will be known officially as the Serviced Apartments II (SA2) typology.

2Of these, two are zoned Residential and the other two are zoned Residential with Commercial at 1st Storey (see Annex 1).

The release, with every site it covered

Source documents2 documents: type, publisher, retrieval date, link and hash
  1. Press releasePublished 4 December 2023

    URA releases sale sites at Zion Road and Upper Thomson Road with a new rental housing typology, as part of continuous efforts to cater to diverse housing needs

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    514d0601fb5d11381cf8c9c808b18f7bf54eb247f8c988cc631572c8c8df5dc7
    Size
    464,122 bytes
    Format
    text/html
    Retrieved at
    2026-09-18 14:52:13 UTC
    Prevo reference
    ura-pr23-48
  2. AnnexPublished 4 December 2023

    Annex 1 to URA releases sale sites at Zion Road and Upper Thomson Road with a new rental housing typology, as part of continuous efforts to cater to diverse housing needsVersion v2

    Version v2 of the annex as linked from the release page; the authoritative version. Earlier versions were not supplied and are not in the capture, so supersedes_doc_key is null.

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    1625c116e1ae2fff5491011efef07c89db826d8a2bf4c117471376b4cd6dab1c
    Size
    23,261 bytes
    Format
    application/pdf
    Retrieved at
    2026-09-18 14:52:13 UTC
    Source version
    v2
    Prevo reference
    ura-pr23-48/pr23-48a_v2.pdf