Skip to main content
Land sales
Reading as of 1 February 2024. Only releases published on or before that date are shown (2 later releases are hidden). Read as of today.

URA sale site · Confirmed List

Jurong Lake District Master Developer site

Tender open99-year lease

Allowable development: White site.

No parcel boundary on record

Not on the map: no sale-site boundary is published for this parcel, so no map is drawn and no location is guessed from the name. The site facts and releases below are the record.

Launched for Concept and Price tender
22 June 2023

Tender outcome

Open for tender. No bids are published until the close.

Site area

64,778.9sqm

Official source

As stated on 22 June 2023 [ura-pr23-19/URA pr23-19a_v4.pdf]

Maximum GFA

365,000sqm

Official source

As stated on 22 June 2023 [ura-pr23-19/URA pr23-19a_v4.pdf]

Estimated housing yield

1,700homes

Estimate

URA's estimate, not a cap. As stated on 22 June 2023 [ura-pr23-19/URA pr23-19a_v4.pdf]

What matters about this site

URA sale site of 64,778.9 sqm on a 99-year lease. Allowable development, as the record states it: White site.

Released on the Confirmed List.

Open for tender. URA estimated about 1,700 homes.

These are recorded site and tender facts. Feasibility, value and future pricing need separate analysis.

Investigate this site

  • No published boundary, so this site cannot be opened on the map.
  • Analyse site in Studio starts a study from this record's area, GFA, tenure and award. You add the assumptions; it is not a finished or compliant feasibility. Sign-in required.
  • Ask Prevo puts a question about this site in the panel. Nothing is sent until you send it.

Overview

The site particulars in force on the reading date, each with the document that stated it. A cap is labelled as a cap and an estimate as an estimate; a figure the annex did not give is absent.

Selling authority
URA
Allowable development
White site
Tenure
99 years
Tender method
Concept and Price Revenue tender: concept proposals are shortlisted first, then price decides among them.
Programme list
Confirmed List, launched for concept and price tender[ura-pr23-19/URA pr23-19a_v4.pdf]
Site area
64,778.9 sqm
  • Plot 1: 37,232.8 sqm
  • Plot 2: 16,284.2 sqm
  • Plot 3: 11,261.9 sqm
  • Air-space and subterranean linkages (Linkages between the plots; no area stated in the annex)
[ura-pr23-19/URA pr23-19a_v4.pdf]
Maximum GFA
365,000 sqm
  • Minimum 146,000 sqm office
  • Maximum 166,000 sqm residential
  • Maximum 146,000 sqm residential: condominiums and flats
  • Maximum 20,000 sqm residential: serviced apartments
  • Minimum 70,000 sqm Phase 1 office
  • Minimum 51,000 sqm Phase 1 residential
[ura-pr23-19/URA pr23-19a_v4.pdf]
Estimated housing units
1,700[ura-pr23-19/URA pr23-19a_v4.pdf]
Height control
View corridor 23m SHD; wind-corridor zone maximum 6 storeys; high-rise zones 140-160m SHD[ura-pr23-19/URA pr23-19a_v4.pdf]
Tender conditions
  • Minimum GFA of each office strata unit: 20,000 sqm
  • Uses other than office, residential, hotel and serviced apartment within each phase: Must form one strata lot
  • Remaining GFA: May support complementary uses including shops, restaurants, entertainment, hotel, community uses or additional offices
  • Phase 1 estimated private homes: 600 units
  • Lease of each phased parcel: 99 years. From the handover date of that phase
  • Option scheme A, option period: 5 years
  • Option scheme A, option fee: 10%
  • Option scheme B, option period: 6 years
  • Option scheme B, option fee: 11%
  • Option scheme C, option period: 7 years
  • Option scheme C, option fee: 12%
  • Option scheme D, option period: 8 years
  • Option scheme D, option fee: 13%
  • Option fee terms: Paid for the right to buy the rest of the land parcel; not refundable if subsequent phases are not taken up; 5% of the option fee percentage paid may offset part of the land price of the last phase. The option period runs from acceptance of tender.
  • Tender method: Concept and Price Revenue tender; only shortlisted concepts proceed to price evaluation
Facts as stated on
22 June 20232 versions on record: 22 June 2023, 13 September 2024. Each is kept; the one in force on the reading date is shown.

Planning claims in the release

What the release said was planned for the precinct. Claims about the area at a date, not controls on this parcel.

  • site: Jurong Lake District Master Developer siteThe proposed integrated development will be progressively completed over the next 10 to 15 years.
  • precinct: Jurong Lake DistrictJLD is envisioned as a model sustainability district with a goal of net-zero emissions for new developments around 2045.
  • site: Jurong Lake District Master Developer siteThe Master Developer is intended to adopt district-level urban solutions such as a district cooling system and a district pneumatic waste conveyancing system.

Tender

Milestones on record

Programme: Confirmed List, launched for concept and price tender, as stated on 22 June 2023. Being on a list is not a tender launch: a launch is the release that reports one.

  1. 22 June 2023Launched for Concept and Price tender release
  2. 13 September 2024Site particulars restated [ura-pr24-42/pr24-42b.pdf]

No bids are on record as of 1 February 2024. Bids are published when the tender closes.

Concept and price tender

Evaluation criteria

  • Quality of Master Plan and Design Concept · 40%
  • Quality of Public Realm · 20%
  • Sustainability · 20%
  • Track Record · 20%

Comparable land sales

Reading comparable land sales…

Location

Parcel
No boundary or point is published for this site.
On the map
Not on the map.

Developments nearby

No sale boundary is published for this site, so distances to developments cannot be measured.

Market

The market at the tender close is read from URA's private housing statistics, so it is not shown for a site with no residential use.

Analyse in Studio

Start a preliminary feasibility study from this site in Prevo Studio. It is a working model for your own assumptions, not a valuation, an approval or a completed feasibility.

Studio models non-landed residential development. This site's zoning combines residential with other uses, so a study models the residential part only and its figures will not describe the whole development.

Carried from this record

Site boundary
Not carried: none is published, so planning controls cannot be read spatially
Site area
64,778.9 sqm
Maximum GFA
365,000 sqm
Tenure
99-year lease
Land price
Not carried: no award, so you enter your own
Comparable land sales
Read again by the same rules on the study's own date, so a study begun today may hold later awards than this page

You confirm in Studio

  • The cadastral lots under the sale boundary, before planning controls are read from them.
  • Zoning, plot ratio and height controls, read from the Master Plan layers; each one Studio cannot settle is marked for you to enter.
  • The selling price: Studio offers an estimate from nearby new sales, labelled as an estimate, for you to replace.
  • Construction costs, unit mix and the other scheme assumptions.
  • Your land price: the record holds no award for this site.
Analyse this site in StudioSign in required. A study is visible only to you unless you share its report.

This page reads the record as of 1 February 2024. A study reads it as it stands today, so what it carries can differ from what is listed above.

Sources

Every release that touched the site, latest first, each on its own date with its text folded beneath, then the documents behind the page.

22 June 2023

Launched for Concept and Price tender

URA launches tender for a Master Developer site at Jurong Lake District to propel the development of Singapore’s largest business district outside the CBD

Read the press releaseura-pr23-19

The Urban Redevelopment Authority (URA) has launched a Master Developer site at Jurong Lake District (JLD) for sale by public tender today under the Confirmed List of the first half 2023 (1H2023) Government Land Sales (GLS) Programme.

Jurong Lake District As part of URA’s decentralisation strategy, JLD will be progressively developed into Singapore’s largest business district outside the city centre to cater to varied business needs. JLD is envisioned to be a model sustainability district with a goal to achieve net-zero emissions for new developments around 2045. It will have distinctive mixed-use developments with well-curated public spaces and amenities to serve the needs of the business and local communities as well as the general public.

Today, the area around the Jurong East MRT interchange station comprises office, retail and institutional uses. By 2028, a new Jurong Region Line station and an Integrated Transport Hub comprising offices, community spaces and retail amenities will be built next to Jurong East MRT interchange station. The Government will sustain the development momentum at JLD, through the release of sites for sale, with the supply carefully paced to take into account economic and market conditions. The commercial hub will be extended progressively and seamlessly southwards into a new 120-hectare precinct via elevated pedestrian linkages and lushly planted streets. With more flexibility in zoning, the expanded JLD allows companies to experiment with new development concepts and innovative ways to integrate live, work and play in a green and car-lite precinct.

Master Developer site to propel development of future business district The Government is releasing the 6.5-hectare White site in the new precinct for sale to a Master Developer to kickstart the next phase of development in JLD, and to cater to demand for office, private residential and complementary spaces in the medium term. (Details of the land parcel can be found in Annex 1, and the location plan in Annex 2 ).

This White site comprises three plots of land linking the existing commercial centre at Jurong East MRT interchange station to the new precinct and the future Jurong Lake District station of the Cross Island Line. With a potential yield of at least 146,000 sqm of office space, about 1,700 dwelling units and 73,000 sqm of gross floor area for complementary uses such as shop, restaurants, entertainment, hotel, community uses or more offices, the proposed integrated development will be progressively completed over the next 10 to 15 years and provide the critical mass to propel the development of this future business district. The successful tenderer will be required to build at least 70,000 sqm GFA of office space and 600 private housing units as part of the first phase of the development, but will have flexibility to phase out the remaining supply according to market demand, via an option scheme drawn up by URA. (Details of option scheme can be found in Annex 3 ).

The intention is for the Master Developer to comprehensively master plan the entire site to integrate the various uses, coordinate implementation of the development and adopt district-level urban solutions such as a district cooling system and district pneumatic waste conveyancing system. These systems allow for more efficient delivery of urban services, in the supply of chilled water and managing waste disposal at a district level and help in the realisation of larger sustainability objectives for JLD.

The Concept and Price Revenue Tender approach will be adopted to evaluate the tender submissions for the site to ensure that the selected concept proposal is aligned with the vision for the JLD. Tenderers are required to submit their concept proposals and tender prices separately. The concept proposals will first be evaluated against a set of criteria specified in the tender (see Annex 4 on evaluation criteria). The intention is to shortlist concept proposals that feature a distinctive, highly sustainable mixed-use development with well-designed people-friendly public spaces and amenities to serve the needs of the business and local communities. Only compelling concept proposals will be shortlisted to proceed to the second stage of evaluation, which will be based on price only1.

Other Details The tender for the JLD Master Developer site will close at 12 noon on 26 March 2024.

1 To further ensure that the site can be awarded to a developer with an exceptional concept that supports the vision and transformation of the district, the tenderer with the most outstanding concept identified at the first Concept Evaluation stage will be offered the option to match the highest bid price amongst the shortlisted concept proposals, should the tenderer not be the highest bidder. This modified tender approach will encourage tenderers to draw up exceptional concept proposals, in order to achieve the best possible development outcome for the precinct. The top-up option will, however, be offered very selectively, limited to one or two proposals that are considered exceptionally outstanding amongst all shortlisted concept proposals in the first Concept Evaluation stage. In the situation where there is no such outstanding proposal identified, the award will be given to the highest bidder.

The release, with every site it covered

Source documents5 documents: type, publisher, retrieval date, link and hash
  1. Press releasePublished 22 June 2023

    URA launches tender for a Master Developer site at Jurong Lake District to propel the development of Singapore’s largest business district outside the CBD

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    c57d457d9f6c4d9bbfc7debd77e60b400f4eed69e0dee13a60f5eae33b8f8e97
    Size
    453,247 bytes
    Format
    text/html
    Retrieved at
    2026-09-18 14:52:11 UTC
    Prevo reference
    ura-pr23-19
  2. AnnexPublished 22 June 2023

    Annex 1 to URA launches tender for a Master Developer site at Jurong Lake District to propel the development of Singapore’s largest business district outside the CBDVersion v4

    Version v4 of the annex as linked from the release page; the authoritative version. Earlier versions were not supplied and are not in the capture, so supersedes_doc_key is null.

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    15c9f507d9f823bef55362a30da38872d8edef5db2b5d3ab3b43bae45f689acb
    Size
    70,704 bytes
    Format
    application/pdf
    Retrieved at
    2026-09-18 14:52:11 UTC
    Source version
    v4
    Prevo reference
    ura-pr23-19/URA pr23-19a_v4.pdf
  3. AnnexPublished 22 June 2023

    Annex 2 to URA launches tender for a Master Developer site at Jurong Lake District to propel the development of Singapore’s largest business district outside the CBD

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    f59e597b195390b6c3af562d90f542426e2afd8ddb47c1a80aa794049334f1d1
    Size
    113,924 bytes
    Format
    application/pdf
    Retrieved at
    2026-09-18 14:52:11 UTC
    Prevo reference
    ura-pr23-19/URA pr23-19b.pdf
  4. AnnexPublished 22 June 2023

    Annex 3 to URA launches tender for a Master Developer site at Jurong Lake District to propel the development of Singapore’s largest business district outside the CBD

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    2fe182cac636b2122a0454a0fc708d6eccda3a6acd822adf12e8a317d3eb8020
    Size
    16,084 bytes
    Format
    application/pdf
    Retrieved at
    2026-09-18 14:52:11 UTC
    Prevo reference
    ura-pr23-19/URA pr23-19c.pdf
  5. AnnexPublished 22 June 2023

    Annex 4 to URA launches tender for a Master Developer site at Jurong Lake District to propel the development of Singapore’s largest business district outside the CBD

    Urban Redevelopment Authority · Retrieved 18 September 2026

    Source fact · Source-backed

    Open original source

    Technical details
    SHA-256
    4671ae61952af090481985f89e8ffa5c7bf116f1930105579fa72be1b00496a6
    Size
    115,290 bytes
    Format
    application/pdf
    Retrieved at
    2026-09-18 14:52:11 UTC
    Prevo reference
    ura-pr23-19/URA pr23-19d.pdf